Thread: Three systems
View Single Post
  #11  
Old 18th March 2011, 08:11 AM
marksto2 marksto2 is offline
Suspended.
 
Join Date: Jan 2011
Posts: 99
Default

Quote:
Originally Posted by Bhagwan
I have used a Racerate system & back tested their figures & they were correct.

They do stipulate that their figures are correct. they also stipulate, that it does not mean it is guaranteed to work in the future .

What one is paying for is their research based on past results because they don't have results from the future.
They then live test the systems for 1-3 months after that to see if they perform

With that Lay plan Mark, can you say what sort of runners the plan targets .
Can you say what one or two of the rules stipulates?

Hi Bhagwan,

Without going into too much. There is a focus on runners with a below average strike rate.
Reply With Quote